Completion Tools
Completion Tools
Completion technologies spanning well construction through multistage fracturing and intervention — built to improve reservoir performance, reduce capital cost, and save rig time.
Multistage Fracturing Completions
- Frac sleeves (fixed- and flex-seat systems for ball-activated and limited-entry completions)
- Frac plugs, including a fully composite design and a dissolvable option
- Toe prep solutions (burst port systems, multi-open-close tools, wet shoes)
- Sand-control multistage fracturing technology for tight reservoirs
- Open-hole packers
Well Construction Completions
- Liner top packers (tested to API 11D1/ISO 14310 and API 19LH, options to 15,000 psi / 600°F)
- Liner hangers
- Liner hanger packers
- Cementing systems (cement heads, liner wiper plugs, stage cementing tools)
- Downhole real-time and memory monitoring subs
Conventional Completions
- Sub-surface safety valves, API 14A-rated to 10,000 psi / 300°F
- Packers: mechanical, hydraulic, and seal-bore versions (API 11D1)
- Flow control products: premium and standard nipples and sliding sleeves (API 14L)
Advanced Completions
- Remote-activation downhole valves (circulation, inflow, clean-out, and tracer valves; electronic liner shoe; tubing filler sub) for offshore and complex wells without wireline or coiled-tubing intervention
Intervention Tools
- Coiled tubing completion tools (flow-activated diversion, hydraulic shifting)
- Wireline completion tools (scale removal, drift tools, slickline jars, fishing/shifting hammers)